Work Continues Inside the House - December 2004

December 12


Sunday, December 12, 2004

The fish-scale siding on the front gable has been corrected.

{click image for a larger picture}
Sunday, December 12, 2004

A round vent has been added above the garage. Shingles have been stacked on the roof.

{click image for a larger picture}
Sunday, December 12, 2004

The fireplace has been installed, but at the wrong height.   It should be 14" off the floor with a raised hearth.

The water on the floor in the next room is the result the water pressure test.   The upstairs bath fixtures have a leak.

{click image for a larger picture}
Sunday, December 12, 2004

The juccuzi bath has been installed in the master bathroom.   The windows are glass block for privacy.

{click image for a larger picture}