Work Continues Outside and Inside the House - December 2004

December 18


Saturday, December 18, 2004

The outside of the house is being painted.   The trim around the door and windows as well as the columns should be painted white.

{click image for a larger picture}
Saturday, December 18, 2004

The shingles are being applied to the roof.

{click image for a larger picture}
Saturday, December 18, 2004

These are the speaker wires and volume control wires coming into the back of the entertainment center.   Altogether there are 20 speakers and 7 volume controls.

The red tube is a conduit for the video connection between the TV and the A/V reciever.

{click image for a larger picture}
Saturday, December 18, 2004

The fireplace has been raised.

{click image for a larger picture}





2004 Chris Guinn
updated 12/21/2004